Pesticide Lag in Surface Runoff and Lateral Flow
In large subbasins with a time of concentration greater than 1 day, only a portion of the surface runoff and lateral flow will reach the main channel on the day it is generated. SWAT+ incorporates a storage feature to lag a portion of the surface runoff and lateral flow release to the main channel. Pesticides in the surface runoff and lateral flow are lagged as well.
Once the pesticide load in surface runoff and lateral flow is determined, the amount of pesticide released to the main channel is calculated:
pstsurf=(pstsurf′+pstsurstor,i−1)∗(1−exp[tconc−surlag]) 4:3.4.1
pstlat=(pstlat′+pstlatstor,i−1)∗(1−exp[TTlat−1]) 4:3.4.2
pstsed=(pstsed′+pstsedstor,i−1)∗(1−exp[tconc−surlag]) 4:3.4.3
where pstsurf is the amount of soluble pesticide discharged to the main channel in surface runoff on a given day (kg pst/ha), pstsurf′ is the amount of surface runoff soluble pesticide generated in HRU on a given day (kg pst/ha), pstsurstor,i−1 is the surface runoff soluble pesticide stored or lagged from the previous day (kg pst/ha), pstlat is the amount of soluble pesticide discharged to the main channel in lateral flow on a given day (kg pst/ha),pstlat′ is the amount of lateral flow soluble pesticide generated in HRU on a given day (kg pst/ha), pstlatstor,i−1 is the lateral flow pesticide stored or lagged from the previous day (kg pst/ha), pstsed is the amount of sorbed pesticide discharged to the main channel in surface runoff on a given day (kg pst/ha), pstsed′ is the sorbed pesticide loading generated in HRU on a given day (kg pst/ha), pstsedstor,i−1 is the sorbed pesticide stored or lagged from the previous day (kg pst/ha), surlag is the surface runoff lag coefficient, tconc is the time of concentration for the HRU (hrs) and TTlag is the lateral flow travel time (days).
Table 4:3-4: SWAT+ input variables that pertain to pesticide lag calculations.
SURLAG
surlag: surface runoff lag coefficient
.bsn
LAT_TTIME
TTlag: Lateral flow travel time (days)
.hru
Last updated