dp_bioz

Depth to the top of the biozone layer from the ground surface

The thickness includes the top soil layer and septic tank effluent (STE) distribution chamber including perforated pipe.

Last updated

#1315: katie.mendoza's Oct 3 ET chapter

Change request updated