mon_op
The month of the simulation that the reservoir becomes operational
If 0 is input for yr_op and mon_op, the model assumes the reservoir is in operation at the beginning of the simulation.
Last updated
The month of the simulation that the reservoir becomes operational
If 0 is input for yr_op and mon_op, the model assumes the reservoir is in operation at the beginning of the simulation.
Last updated