Tile Flow
When drainage tiles are installed in a pothole, the pothole will contribute water to the main channel through tile flow. The pothole outflow originating from tile drainage is:
if 8:1.3.12
if 8:1.3.13
where is the volume of water flowing out of the water body during the day (m HO), is the average daily tile flow rate (m/s), and is the volume of water stored in the pothole (m HO).
Table 8:1-3: SWAT+ input variables that pertain to potholes.
Variable Name | Definition | File Name |
---|---|---|
IPOT | Number of HRU that is impounding water (that contains the pothole) | .hru |
MONTH/DAY or HUSC | Timing of release/impound operation. | .mgt |
MGT_OP | Operation code. MGT_OP = 13 for release/impound operation | .mgt |
IMP_TRIG | Release/impound action code: 0: impound, 1: release | .mgt |
SLOPE | : Slope of the HRU (m/m) | .hru |
POT_FR | : Fraction of the HRU area draining into the pothole | .hru |
EVLAI | : Leaf area index at which no evaporation occurs from the water surface | .bsn |
POT_VOLX | : Maximum amount of water that can be stored in the pothole (mm) | .hru |
POT_TILE | : Average daily tile flow rate (mm) | .hru |
Last updated