option

OptionDescriptionconstconst2fp

rate

Release at constant rate

Release rate in m3/s

rate_pct

Release at percentage of principal volume

Percentage of principal volume

inflo_frac

Release at fraction of inflow

Fraction of inflow

ab_emer

Release all volume above emergency

Emergency volume

days

Number of days it takes to drawdown to target volume

Number of days

Multiplier

Target volume

dyrt

Release based on drawdown days and percentage of principal volume

Number of days

Release rate in m3/s

inflo_targ

Release inflow and all volume over target

Target volume

irr_dmd

Release based on irrigation demand of HRU or other water allocation object

weir

Release based on weir equation

meas

Release measured outflow

Recall file

Last updated