vol_es
Volume of water needed to fill the reservoir to emergency spillway
Last updated
Volume of water needed to fill the reservoir to emergency spillway
Last updated
QSWAT+ assumes an average reservoir depth of 10 m, so the default volume of water needed to fill the reservoir to principal spillway is * 10.