Pesticide Lag in Surface Runoff and Lateral Flow

In large subbasins with a time of concentration greater than 1 day, only a portion of the surface runoff and lateral flow will reach the main channel on the day it is generated. SWAT+ incorporates a storage feature to lag a portion of the surface runoff and lateral flow release to the main channel. Pesticides in the surface runoff and lateral flow are lagged as well.

Once the pesticide load in surface runoff and lateral flow is determined, the amount of pesticide released to the main channel is calculated:

Table 4:3-4: SWAT+ input variables that pertain to pesticide lag calculations.

Last updated