arrow-left

All pages
gitbookPowered by GitBook
1 of 1

Loading...

Actual Water Uptake

Once the potential water uptake has been modified for soil water conditions, the actual amount of water uptake from the soil layer is calculated:

wactualup,ly=min⌊wup,lyβ€²β€²,(SWlyβˆ’WPly)βŒ‹w_{actualup,ly}=min\lfloor w''_{up,ly},(SW_{ly}-WP_{ly})\rfloorwactualup,ly​=min⌊wup,ly′′​,(SWlyβ€‹βˆ’WPly​)βŒ‹ 5:2.2.7

where wactualup,lyw_{actualup,ly}wactualup,ly​ is the actual water uptake for layer lylyly (mm H2_22​O), SWlySW_{ly}SWly​ is the amount of water in the soil layer on a given day (mm H2_22​O), and WPlyWP_{ly}WPly​ is the water content of layer lylyly at wilting point (mm H2_22​O). The total water uptake for the day is calculated:

wactualup=βˆ‘ly=1nwactualup,lyw_{actualup}=\sum^n_{ly=1} w_{actualup,ly}wactualup​=βˆ‘ly=1n​wactualup,ly​ 5:2.2.8

where is the total plant water uptake for the day (mm HO), is the actual water uptake for layer (mm HO), and n is the number of layers in the soil profile. The total plant water uptake for the day calculated with equation 5:2.2.8 is also the actual amount of transpiration that occurs on the day.

5:2.2.9

where is the actual amount of transpiration on a given day (mm HO) and is the total plant water uptake for the day (mm HO).

Table 5:2-2: SWAT+ input variables that pertain to plant water uptake.

Variable Name
Definition
Input File
wactualupw_{actualup}wactualup​
2_22​
wactualup,lyw_{actualup,ly}wactualup,ly​
lylyly
2_22​
Et,act=wactualupE_{t,act}=w_{actualup}Et,act​=wactualup​
Et,actE_{t,act}Et,act​
2_22​
wactualupw_{actualup}wactualup​
2_22​

EPCO

epcoepcoepco: Plant uptake compensation factor

.bsn, .hru