Once the potential water uptake has been modified for soil water conditions, the actual amount of water uptake from the soil layer is calculated:
5:2.2.7
where is the actual water uptake for layer (mm HO), is the amount of water in the soil layer on a given day (mm HO), and is the water content of layer at wilting point (mm HO). The total water uptake for the day is calculated:
5:2.2.8
where is the total plant water uptake for the day (mm HO), is the actual water uptake for layer (mm HO), and n is the number of layers in the soil profile. The total plant water uptake for the day calculated with equation 5:2.2.8 is also the actual amount of transpiration that occurs on the day.
5:2.2.9
where is the actual amount of transpiration on a given day (mm HO) and is the total plant water uptake for the day (mm HO).
Table 5:2-2: SWAT+ input variables that pertain to plant water uptake.
Variable Name | Definition | Input File |
---|---|---|
EPCO
: Plant uptake compensation factor
.bsn, .hru