When drainage tiles are installed in a pothole, the pothole will contribute water to the main channel through tile flow. The pothole outflow originating from tile drainage is:
if 8:1.3.12
if 8:1.3.13
where is the volume of water flowing out of the water body during the day (m HO), is the average daily tile flow rate (m/s), and is the volume of water stored in the pothole (m HO).
Table 8:1-3: SWAT+ input variables that pertain to potholes.
Variable Name | Definition | File Name |
---|---|---|
IPOT
Number of HRU that is impounding water (that contains the pothole)
.hru
MONTH/DAY or HUSC
Timing of release/impound operation.
.mgt
MGT_OP
Operation code. MGT_OP = 13 for release/impound operation
.mgt
IMP_TRIG
Release/impound action code: 0: impound, 1: release
.mgt
SLOPE
: Slope of the HRU (m/m)
.hru
POT_FR
: Fraction of the HRU area draining into the pothole
.hru
EVLAI
: Leaf area index at which no evaporation occurs from the water surface
.bsn
POT_VOLX
: Maximum amount of water that can be stored in the pothole (mm)
.hru
POT_TILE
: Average daily tile flow rate (mm)
.hru