When a release operation is scheduled, all water in the pothole becomes outflow:
Vflowout​=V 8:1.3.11
where Vflowout​ is the volume of water flowing out of the water body during the day (m3 H2​O), and V is the volume of water stored in the pothole (m3 H2​O).