The modified rational formula used to estimate peak flow rate is obtained by substituting equations 2:1.3.15, 2:1.3.16, and 2:1.3.17 into equation 2:1.3.1
2:1.3.20
where is the peak runoff rate (), is the fraction of daily rainfall that occurs during the time of concentration, is the surface runoff (mm HO), is the subbasin area (km), is the time of concentration for the subbasin (hr) and 3.6 is a unit conversion factor.
Table 2:1-5: SWAT+ input variables that pertain to peak rate calculations.
Variable Name | Definition | Input File |
---|---|---|
SUB_KM
Area of the subbasin (km)
.sub
HRU_FR
Fraction of subbasin area contained in HRU
.hru
SLSUBBSN
: Average slope length (m)
.hru
HRU_SLP
: Average slope steepness (m/m)
.hru
OV_N
: Manning’s “n” value for overland flow
.hru
CH_L(1)
: Longest tributary channel length in subbasin (km)
.sub
CH_S(1)
: Average slope of tributary channels (m/m)
.sub
CH_N(1)
: Manning’s “n” value for tributary channels
.sub