arrow-left

All pages
gitbookPowered by GitBook
1 of 1

Loading...

Antecedent Soil Moisture Condition

SCS defines three antecedent moisture conditions:

I—dry (wilting point), II—average moisture, and III—wet (field capacity). The moisture condition I curve number is the lowest value the daily curve number can assume in dry conditions. The curve numbers for moisture conditions I and III are calculated with the equations:

CN1=CN2−20∗(100−CN2)(100−CN2+exp[2.533−0.0636∗(100−CN2)])CN_1=CN_2-\frac{20*(100-CN_2)}{(100-CN_2+exp[2.533-0.0636*(100-CN_2)])}CN1​=CN2​−(100−CN2​+exp[2.533−0.0636∗(100−CN2​)])20∗(100−CN2​)​ 2:1.1.4

CN3=CN2∗exp[0.00673∗(100−CN2)]CN_3=CN_2*exp[0.00673*(100-CN_2)]CN3​=CN2​∗exp[0.00673∗(100−CN2​)] 2:1.1.5

where CN1CN_1CN1​ is the moisture condition I curve number, CN2CN_2CN2​ is the moisture condition II curve number, and CN3CN_3CN3​ is the moisture condition III curve number.